Update: 199 Grafton – Public meeting (April 27, 2021)

The proposed development is located in downtown Charlottetown. Why was the public meeting not held downtown?  Choosing the Rodd Royalty Hotel on Capital Drive prevented car-less (or car-free) residents from participating in person, since no public transit is available in the evening.
This is intentional exclusion.

The meeting starts at minute 19:00 in the video-recording and runs a little over one hour.

A few thoughts about APM’s application for the proposed 84-unit apartment building and 213-space parkade:

1. A development application that requires seven variances — and not minor variances at that — should never have been approved by the Planning Department. A requirement is precisely what the word says: “A thing that is compulsory; a necessary condition.” (Oxford Dictionary). Why wasn’t the application refused on grounds that the building plans failed to fulfill the requirements?

2. Parkade: Should the project eventually be approved, would the 213 parking spaces in the new building be seen as an opportunity for the City to reduce on-street parking by an equal number of spaces? Downtown sidewalks are already narrow enough. Removing on-street parking would enable the City to widen sidewalks on several blocks along Prince, Kent, Great George, and Grafton, and/or make room for bicycle lanes. This would create a more walkable and pedestrian/cyclist friendly downtown. Many North American cities have been making such changes over the past year.

3. Clark Street: This street has been neglected for too long. A 278-foot long, 71-foot high building would overshadow and overwhelm the two- and three-storey residences on Kent Street whose backyards are on Clark Street. Curiously enough, Mr Banks’s slide show did not include an image of the proposed building from a Clark Street perspective.

4. Professional design review: Doug MacArthur was present at the meeting and pointed out that Fellow & Company Limited (45:00) is the same firm that did the design review for Killam’s 15 Haviland project (1:03:45–1:05:45).


The application for 199 Grafton will be presented to the Planning Board and streamed live on Monday, 3 May, starting at 4:30 p.m.

Author: New Charlottetown Project

Barbara Dylla has lived in Charlottetown since 2017. The aim of this blog is to inspire and encourage Charlottetowners to be more aware of municipal affairs, to participate as engaged citizens, to support an issue close to their heart, so that together we create a sense of the larger community we live in. And, along the way, become a united community passionate about making Charlottetown the best it can be.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s